Rehabilitation Prescription
Records: 3
| ID | Prescription Number | Revision | Title | Design Basis | Final Landform |
|---|---|---|---|---|---|
| 1 | RRM-PRS-D01 | A | North Dump Rehabilitation Prescription (Revision A... | 2022 erosion assessment; batter angle 20 degrees w... | Uniform 20-degree batters to a rounded crest. |
| 2 | RRM-PRS-D01 | B | North Dump Rehabilitation Prescription (Revision B... | 2025 erosion modelling calibrated against four yea... | 18-degree batters, maximum 20 m between benches, r... |
| 3 | RRM-PRS-D03 | A | Southern Infrastructure Decommissioning and Rehabi... | Hazardous materials survey RRM-DOC-0955 and the 20... | Hardstand ripped and graded to drain to natural co... |
1 : 3 : 3
of 1