Domain Criterion

ID Closure Domain Completion Criterion Name Applicability Domain Target Value
1 North Dump Stage 2 Eastern Batter Public and stock safety D01-S2 / SAFE-01 Applies in full. Assessed prior to the certificati... -
2 North Dump Stage 2 Eastern Batter Landform erosion stability D01-S2 / STAB-01 Applies in full. Five annual drone surveys 2021-20... 4.0
3 North Dump Stage 2 Eastern Batter Native vegetation trajectory D01-S2 / VEG-01 Applies in full, assessed against the paired REF-W... 60.0
4 North Dump Stage 2 Eastern Batter Downstream water quality D01-S2 / WATER-01 Applies at the downstream compliance point, which ... 800.0
5 North Waste Rock Dump Landform erosion stability D01 / STAB-01 Applies to each batter as it is released; Stage 2 ... 4.0
6 North Waste Rock Dump Downstream water quality D01 / WATER-01 Applies to the whole dump seepage catchment via th... 800.0
7 East Pit Permanent access control (non-use areas) D02 / ACCESS-01 The governing criterion for the final void non-use... -
8 East Pit Public and stock safety D02 / SAFE-01 Applies to the highwall and void perimeter once mi... -
9 Southern Infrastructure Public and stock safety D03 / SAFE-01 Applies after demolition, services isolation and h... -
10 Southern Infrastructure Native vegetation trajectory D03 / VEG-01 Applies to the ripped and revegetated hardstand ar... 60.0
of 1